SpaceRef -
27 Oct 2014 21:18
Today: SpaceX-4 Departure Preparations: The Crew performed final cargo loading today. Once loading was complete, they egressed Dragon, closed the hatch, and configured the Node 2 vestibule which included installation of the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs)....
Share this Article
Comment on this Article
Please to comment