When it was first given the go-ahead back in 2012, Britain's new high-speed rail line connecting the south, the Midlands and the north of England was predicted to cost £32.7bn.
When it was first given the go-ahead back in 2012, Britain's new high-speed rail line connecting the south, the Midlands and the north of England was predicted to cost £32.7bn.